TL;DR · Key Takeaways
- Preparing a host as a transport node installs the NSX kernel modules, configures the VDS as the host switch (N-VDS is gone), gives the host its TEP vmkernels, and starts the local control plane agent.
- You do not prepare hosts one by one. A Transport Node Profile (TNP) applies the host switch, transport zones, uplink profile, and TEP pool to every host in the cluster, identically.
- EDP Standard is the default host-switch datapath mode in VCF 9. You change it in the TNP, not per host, and almost no one should change it.
- Get the uplink mapping right: physical vmnics map to named uplinks in the uplink profile, which map to VDS uplinks to the top-of-rack switches. A swapped NIC here is a quiet outage.
- Never trust a green “Configured” state alone. vmkping the TEPs and check the host switch from the CLI before you call a host ready.
This is the step where the design stops being a diagram and starts being real. Up to now NSX has been appliances and planning documents. Preparing a host as a transport node is the moment the overlay actually exists on that host: the kernel learns to encapsulate GENEVE, the Distributed Firewall starts filtering at the vNIC, and the host joins the fabric. It is also the step people rush, because the UI makes it look like one click on a cluster. The click is easy. Knowing what it changed, and proving it worked, is the part that keeps you out of a 2 a.m. call later.
What preparing a host actually does
“Prepare” is a tidy word for a meaningful change to the hypervisor. When a host becomes a transport node, NSX installs its kernel modules (VIBs) into ESXi, attaches the host’s VDS as the NSX host switch and sets its datapath mode, creates one or more TEP vmkernel interfaces and gives them addresses from your IP pool, and starts the nsx-proxy agent that is the host’s local control plane. From that point the host can carry overlay traffic and enforce firewall rules in the kernel. None of this disturbs running VMs if the design is right, which is exactly why getting the design right in Part 4 mattered.
The Transport Node Profile does it cluster-wide
You almost never prepare a single host in production. You build a Transport Node Profile once, bundling the host switch (the VDS and its datapath mode), the transport zones, the uplink profile, and the TEP IP pool, and you apply that profile to the cluster. NSX then prepares every host in the cluster to the same spec, and keeps any host you add later in line automatically. This is the difference between a fleet that is identical by construction and one that drifts host by host until a single odd node causes a problem nobody can explain. Use the profile. Preparing hosts individually is for labs and for the one-off bare-metal Edge.
EDP Standard, and leaving it alone
The host switch runs a datapath mode, and in VCF 9 that mode defaults to EDP Standard for every new deployment. You set it in the Transport Node Profile, not on individual hosts, which is one more reason the profile is the right tool. EDP Standard runs the improved forwarding stack and allocates CPU to the datapath dynamically, so you get the throughput without hand-reserving cores. For general compute and for Edge clusters, this is the recommended mode and the one I leave in place every time. The only reason to move to the prescriptive EDP Dedicated mode is a measured, named requirement, covered in the performance deep dive (Part 26). For the why behind the speed, see how NSX Enhanced Data Path delivers its throughput boost in VCF 9.
One real planning constraint hides here: EDP needs a supported NIC and driver. An unsupported card does not error loudly; it quietly forwards on a slower path and you lose the performance you designed and paid for. Confirm every host model’s NIC against the VCF 9 EDP compatibility list before you standardize on it, because finding out after you have racked forty hosts is an expensive lesson.
Mapping uplinks: the swap that bites
This is the part of host prep most likely to go subtly wrong. NSX does not talk to physical NICs directly. The uplink profile defines named uplinks and a teaming policy; when you prepare the host, you map each physical vmnic to one of those named uplinks, and the VDS carries them to the top-of-rack switches. Get the mapping consistent across every host, and confirm which physical cable each vmnic actually is. I have seen vmnic2 on half a rack patched to a different switch than the other half, and the symptom is maddening: most things work, failover does not, and traffic takes a path nobody drew.
Verify the prepared host
NSX will show the host as “Configured” with a green tick the moment the install finishes. That tick means the configuration applied, not that overlay traffic actually flows. Treat it as the start of verification, not the end. SSH to the host, drop into the NSX CLI, and confirm the host switch, the TEPs, and most importantly that this host’s TEP can reach another host’s TEP at full MTU.
# Confirm the NSX kernel modules are installed
esxcli software vib list | grep -i nsx
# Drop into the NSX CLI on the host
nsxcli
# Host switch present and in the expected datapath mode
get host-switch
# TEP interfaces exist and have addresses from the pool
get vteps
# The real test: TEP-to-TEP at full overlay MTU (DF bit set)
vmkping ++netstack=vxlan -d -s 1572 <remote_host_TEP_IP>
If the vmkping returns clean replies, the host is genuinely part of the overlay. If it fails while a normal-size ping works, you are back to the MTU weakest-link problem from Part 4, and the fix is in the physical path, not in NSX. This one command separates “NSX says it is fine” from “it is actually fine,” and it is the single most useful check in the whole bring-up.
| Check | Where | Pass looks like |
|---|---|---|
| Node state | NSX UI, transport nodes | Configured, node status Up, realization success. |
| Kernel modules | esxcli vib list | nsx VIBs present on the host. |
| TEPs | nsxcli get vteps | vmkernels exist, addresses from your pool. |
| Overlay reachability | vmkping vxlan netstack | Replies at 1572 with DF set, no loss. |
| Uplinks | NSX UI / esxcli | Both uplinks up, mapped to the right vmnics. |
When host prep goes wrong
Host preparation fails in a small number of recognizable ways, and almost all of them trace back to the design or the physical network rather than NSX itself. Here is the short diagnostic list I keep.
| Symptom | Likely cause | Fix |
|---|---|---|
| Configured, but TEP vmkping fails | MTU below 1600 on a hop, or TEP VLAN not routed | Fix physical MTU and TEP VLAN routing (Part 4). |
| TEP has no address | IP pool exhausted or wrong subnet | Expand the pool, confirm the subnet matches the VLAN. |
| Throughput far below expectation | NIC not on the EDP compatibility list, fell back | Use a supported NIC/driver; re-check the HCL. |
| Prep stalls or partially applies | A vmnic still owned by a standard switch or in use | Free the NIC, confirm VDS uplink assignment, retry. |
Will it disrupt running VMs?
This is the first question every operations team asks, and the honest answer is: it should not, if the design is right, but you still plan it as a careful, rolling change. Because NSX 9 uses the existing VDS as the host switch rather than swapping in a separate N-VDS, preparation is far less invasive than the old N-VDS migrations were. The kernel modules install and the host switch picks up its NSX configuration without tearing down the VMs’ existing port groups. In a healthy cluster with DRS, the safe pattern is still to let the platform prepare hosts one at a time, with capacity to move workloads if a host needs attention, rather than blasting an entire production cluster in one window and hoping.
The exception is the brownfield host that is already running N-VDS from an older NSX-T deployment. You cannot simply re-prepare it onto a VDS in place and expect a clean result; that is a migration, not a preparation, and it has its own workflow and its own risks. If you are staring at hosts that still carry N-VDS, stop here and treat it as the dedicated project it is. That whole path, the Upgrade Coordinator and the N-VDS to VDS migration, gets a full part later in the series (Part 27), because doing it casually mid-prep is how a routine change turns into an outage. Greenfield hosts have none of this baggage: a fresh ESXi host with a clean VDS prepares cleanly.
What I’d Do
Build one Transport Node Profile per cluster, leave EDP on Standard, and confirm the NICs are on the compatibility list before any of this. Apply the profile, let NSX prepare every host the same way, and then do the part most people skip: vmkping the TEPs and read the host switch from the CLI before you tell anyone the cluster is ready. A prepared host that pings its peers at 1572 with the DF bit set is genuinely on the overlay; a green tick is just a promise. Get into the habit of proving it, and the segments and gateways you build in the next parts will sit on a foundation you actually trust. Next up is Part 7: Edge transport nodes and Edge clusters, where north-south traffic gets its own dedicated nodes. Are your host NICs actually on the EDP list, or did someone assume?
Verifying the host actually joined the data plane
Preparing a host transport node is not finished when the UI says configured; it is finished when you have proven the host is carrying overlay traffic. The configured state tells you NSX pushed the intent, not that the data path works, and the gap between those two is where a half-joined host sits looking fine while quietly failing to pass east-west traffic.
After preparation I confirm three things on the host itself: the TEP came up with the right address and MTU, the tunnels to other transport nodes are established with healthy BFD, and the host switch is running the Enhanced Data Path mode you intended rather than silently falling back. A full-size do-not-fragment ping between TEPs over the overlay stack is the single most useful check, because it exercises exactly the path GENEVE will use and catches the MTU mismatch that the configured state will never reveal. Verify at the data plane, not at the management plane, and a host either genuinely joined or it did not, with no ambiguity left to bite you later.
References
- Enhanced Data Path (Broadcom TechDocs, VCF 9)
- NSX Manager VM and Host Transport Node System Requirements (NSX 9.0)
- NSX 9 Design and Planning: Transport Zones, MTU, TEP Pools and EDP (NSX Series, Part 4)